Type: other
Philippines
This Cavite port high-pole light in stallation project mainly complete s the installation of 910 high-pole lights, all of whic h use a centraliz ed control syste m to achieve int elligent lighting control. The wiri ng between the system equipme nt adopts a distri buted bus struct ure. Sensors, int elligent digital di splay, etc. are co nnected to the c entralized contr oller in the distri bution box throu gh 485 double-w ires, and each la mp circuit is con nected through an AC contactor and an i